Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the School Construction topic

No spam. Unsubscribe anytime.

Bullard ISD board approves corridor flooring replacement at high school

Bullard Independent School District Board of Trustees · March 31, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Bullard ISD Board of Trustees approved Alternate 1 for the high school renovation—replacement of corridor flooring—by a 6-0 vote on March 31, 2026; the motion was made by Chris McNertney and seconded by Brian Hebert.

The Bullard Independent School District Board of Trustees approved Alternate 1 for the high school renovation project — replacement of corridor flooring — in a unanimous 6-0 vote during a special meeting on March 31, 2026. Chris McNertney moved the motion and Brian Hebert seconded; the minutes record the motion as carried 6-0.

President Stephanie Luper opened the meeting and formally established a quorum, saying, “Let the record indicate that a quorum of board members is present, that this meeting is duly called, and that notice of this meeting was posted in accordance with The Texas Open Meeting Act, Texas Government Code, Chapter 551.” The agenda lists routine business and an Open Forum but contains no substantive public comments in the transcript provided. The motion to approve the corridor flooring alternate appears as a discrete action item in the minutes and is recorded as adopted without recorded dissent.

The motion was recorded as a formal action in the meeting minutes; the minutes do not specify contractor names, estimated cost for the alternate, or implementation timeline. Those details were not specified in the minutes provided and would ordinarily appear in project procurement or contract documents. The board later took a second separate vote on a different renovation alternate and completed TASB training before adjourning at 8:41 p.m.