County staff report failed underground tank at Justice Center and other facility maintenance needs
Summary
Maintenance supervisor Adam Miller told commissioners the Justice Center underground storage tank (installed 1989) failed inspections; commissioners asked for repair, replacement and abandonment quotes. Miller also reported HVAC, greenhouse heater, ramp and railing needs and provided a $1,248 repair quote for washing machine drains.
Get email alerts on the Facilities Maintenance topic
No spam. Unsubscribe anytime.
At 11:15 a.m., maintenance supervisor Adam Miller briefed the board on multiple county facility issues. Miller reported the Justice Center's underground storage tank, installed in 1989, failed both inspections; the board discussed options including repair, replacement, abandonment or converting to natural gas. Commissioners asked Miller to obtain quotes for repairing, replacing and abandoning the tank and to check feasibility and cost of switching to natural gas.
Miller reported a $1,248 quote from KC Rooter Sewer & Drain to repair washing machine waste drains at the Justice Center and noted outstanding HVAC work such as trim around enclosures and air duct detector installations. He said greenhouse heating units installed under warranty may not keep up with forecast cold temperatures and asked permission to trade in a grapple bucket for a heavy‑duty bucket for the skid steer and to sell or trade the white maintenance truck and van to fund a replacement. Commissioners requested quotes for window and roof replacement at the county home and for the concrete ramp at the courthouse.
The board did not take immediate action beyond requesting cost estimates and directed Miller to return with quotes for the various options and repairs.