Summary

Town staff recommended an interim repair to the aging work boat and re-bidding for a replacement; figures discussed included a prior low bid of about $172,000 to build a new boat, immediate repair estimates of $4,300–$4,400, and a more extensive refit estimate of about $18,000, with proposed funding from the waterways fund (~$209,000).

Public works staff told the board that bids received in December 2024 showed a low estimate of about $172,000 to build a new work boat tailored to the town's needs. Staff said the existing vessel requires either a minimal emergency repair estimated at roughly $4,300–$4,400 to restore safe operation for the near term or a substantial deck and framing refit at approximately $18,000 that would meaningfully extend its useful life but still fall short of a full replacement.

Staff recommended performing the interim repairs to keep the boat in service and rebidding for a new build, noting that the waterways fund — composed of user fees, not general tax dollars — currently has funds that could be applied. One board member said the waterways fund balance was about $209,000 going into 2026 and suggested using that account rather than general taxes. Members noted engines were replaced in 2015–2016, which affects resale and life-cycle calculations.

Board members also emphasized the need for capital planning for marine assets (bulkheads, boats) and requested staff present a schedule of lifecycle costs. The board did not record a formal resolution in the public session but directed staff to pursue the emergency or interim fix to keep operations running for the coming season while planning a longer-term replacement.