Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation topic

No spam. Unsubscribe anytime.

Traffic consultants tell Shorewood board proposed mixed‑use plan generates fewer trips than all‑commercial site; IDOT probing Route 59/Black Road

Village Board of Shorewood · June 9, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Traffic consultant KLOA presented counts and capacity analysis showing the mixed‑use PUD would generate fewer daily trips than a full commercial use on the same acreage; IDOT is in Phase 1 engineering for improvements at Route 59/Black Road (dual turn lanes under study).

Shorewood’s traffic consultant explained the methodology behind trip projections for the Black Road project and said intersection and signal improvements would accommodate the development’s traffic.

Bridal May, principal at KLOA Inc., described the study area, weekday peak hour counts and the use of the Institute of Transportation Engineers trip generation methodology. The consultant said the proposed mixed‑use plan (149 apartments plus retail outlots) results in approximately 2,240 daily trips from the 9‑acre site and about 660 trips attributed to the apartment portion. May emphasized those projections are lower than a hypothetical all‑commercial development on the same acreage, which the consultant estimated would generate significantly more daily trips. Separately, a village representative said IDOT is in phase 1 engineering for the Route 59/Black Road intersection, and that proposed improvements include dual turn lanes on 59; no construction timeline was available.