Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Accessibility topic
No spam. Unsubscribe anytime.
Designs emphasize improved pedestrian and bicycle access and use MobiMats for beach connections
Summary
Designers proposed a primary walkway, a two-way cycle track with planted buffers, and MobiMats for boardwalk-to-beach connections; presenters said all structures would be ADA accessible though ramps may be long where platforms are raised above base flood elevation.
Get email alerts on the Accessibility topic
No spam. Unsubscribe anytime.
Consultants described plans to improve pedestrian and bicycle access to Easton's Beach, including a primary walkway and a dedicated two-way cycle track south of Memorial Boulevard with a planted buffer. "We've added a robust primary walkway connection, but also a dedicated 2 way cycle track," Ian said, and consultants showed visuals of boardwalks moved slightly landward to reduce storm damage.
Team members also addressed beach access aids: all boardwalk-to-beach connections would use MobiMats to provide pedestrian and maintenance/emergency access, and designers said all new buildings and boardwalks would be ADA accessible with sloped ramps or switchbacks where necessary. The consultants noted the trade-off that higher elevated platforms require longer ramps to meet accessibility standards.
