Get email alerts on the Anson Dunten Changeorder topic
No spam. Unsubscribe anytime.
Drainage change order: Anson Dunten reconstruction approved for $200,332.67 increase
Summary
The board approved Change Order #2 for the Anson Dunten reconstruction, allocating $200,332.67 to Krafft Water Solutions to cover poor soil conditions and additional measures to avoid a gas service line.
Get email alerts on the Anson Dunten Changeorder topic
No spam. Unsubscribe anytime.
The Allen County Drainage Board approved Change Order #2 for the Anson Dunten Drain reconstruction (ARPA-funded Huntertown Stormwater Relief Project), adding $200,332.67 to the contract for Krafft Water Solutions.
ACSO staff said the increase was necessary because unforeseen poor soil conditions required additional measures and to avoid a gas service line that added cost. The board voted to approve the change order after ACSO recommendation; Ron Turpin moved for approval and Rich Beck seconded the motion.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
