Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Traffic Calming topic

No spam. Unsubscribe anytime.

Trustees debate speed humps, drainage limits for Phillips and Tremont repaving

Village of Nassau Board · December 10, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Board members discussed using CHIPS road funds to repave Phillips and Tremont and whether to add speed humps or dips; engineering and drainage constraints were raised and members plan bidding in February for spring work.

Trustees discussed planned road work for Phillips and Tremont under the CHIPS road-repair rotation and whether to include traffic-calming devices such as speed humps or longer, shallow dips. A member said the village should decide now and bid in February so work can be done in spring.

“I've seen them both… I think we're gonna have to go with the humps,” the Chair said, noting drainage and curb constraints that can make dips unsuitable on curbed streets. Members emphasized the importance of consulting engineers to avoid creating drainage problems where curbing prevents water from escaping a dip. One resident and members recounted a near-miss where a visitor’s car nearly struck a pedestrian and killed a pet, underscoring safety concerns on the residential circle.

Board members agreed to investigate which devices are appropriate in constrained, curbed areas and to coordinate engineering work with the CHIPS-funded repaving schedule; staff will check whether CHIPS can pay for any required engineering and will report back.