Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Aquatic Center topic

No spam. Unsubscribe anytime.

Board hears concept for aquatic-center expansion and indoor recreation space

Astoria Parks Board · March 25, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The draft plan recommends expanding the aquatic center with flexible indoor recreation space such as courts and fitness areas; board members asked for more detailed renderings but staff said only rough floor plans and an earlier feasibility study are available.

The master-plan draft includes an aquatic-center expansion that could add flexible indoor recreation space (sport courts, fitness space) to support year-round activities. Ian described the concept and said two locations for permanent public restrooms were identified — Fred Lindstrom Park and a Riverwalk site at 9th Street — and that the draft draws on a prior feasibility study.

Howard Rube asked whether more detailed renderings exist and how many courts the concept would include; staff answered the plans are "very rough" at this stage and noted a 2023–24 concept/feasibility study by Scott Edwards Architects that identified several layout options. The board agreed the feasibility work should inform next steps before any specific capital request is advanced to council.