Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Synthetic Turf topic

No spam. Unsubscribe anytime.

Board approves special exception allowing extra synthetic turf at Lighthouse Point home

Planning and Zoning Board, City of Lighthouse Point · June 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Planning & Zoning Board unanimously approved a special exception allowing about 950 sq. ft. more synthetic turf than normally permitted at 3314 Northeast 27th Terrace, finding the site's unusual configuration and a high pervious-area percentage supported the request.

The Lighthouse Point Planning & Zoning Board unanimously approved a special exception for Robert Evans's property at 3314 Northeast 27th Terrace to allow roughly 950 square feet of additional synthetic turf over the normal 25% landscaped-area limit.

Dave Dixon, the consulting city planner, told the board staff's review found unusual site conditions and noted the lot is about 44.6% pervious, "almost double the minimum required of 25%," a factor staff said supports the exception. The applicant, Robert Evans, told the board the narrow northeast and east-side strips receive little sun and that "it's impossible to grow grass over there." Evans said the turf would allow his children to use the space safely.

Board members pressed staff on whether turf counts as pervious (staff: yes, if it meets design and installation criteria) and discussed precedent and aesthetic concerns. One member noted that a ground-cover ordinance coming later on the agenda should provide clearer rules for similar requests. Susan Motley moved to approve the request; the motion passed on a unanimous roll call (Michael Cohen — Favor; Fred McLean — Favor; Susan Motley — Yes; Bill Gallo — Yes; Dennis Smith — Yes).

The chair told Evans he could proceed to the building-permit stage and that no additional board approvals were expected, with staff and the city clerk available to assist with permit processing.