Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Facility Maintenance topic

No spam. Unsubscribe anytime.

Commission reviews $62K–$77K hangar-door quotes and discusses using AIP funds; manager requests $125,000 withdrawal for maintenance

Fitchburg Municipal Airport Commission · January 21, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Building #7's failing hangar door prompted two replacement quotes ($62,413 and $77,552). Airport Manager requested permission to withdraw $125,000 from AIP Grant #67003525 to cover the door replacement, an interior office door and other maintenance; Chair Raymond asked for firm numbers before approving expenditure.

The commission reviewed competing quotes to replace a failing hangar door on Building #7 and discussed whether to use AIP grant funds for the work.

Airport Manager Russ Cornenia presented two proposals: Overhead Door of Worcester offered an insulated motorized door with new tracking and two electric lifts for $62,413; PowerLift Doors of New England quoted $77,552 but noted additional structural work and a raised header would be required. Cornenia said recent repairs to the existing manual door cost about $1,600 and that the door has become a safety issue.

Manager Cornenia requested permission to withdraw $125,000 from AIP Grant #67003525 (listed at $1.139 million in meeting materials) to pay for the Building #7 door, an interior door for the administration building and other maintenance items, including continuing clean-up of Building #6. Chair Clayton Raymond said he wanted firm cost estimates before committing grant dollars and said the tenant should be consulted about potential improvements and resulting rent adjustments.

No final expenditure was approved at the meeting; the manager was instructed to return with detailed numbers and tenant input. Any use of AIP funds would be subject to grant rules and additional approvals.