Citizen Portal

Get email alerts on the Transportation Infrastructure topic

No spam. Unsubscribe anytime.

Highway department wins INDOT coordination for Kenner Road bridge project; interns present summer work

Elkhart County Board of Commissioners · August 10, 2026

Summary

The board approved an INDOT project coordination contract that secures 80% engineering reimbursement for the Kenner Road bridge superstructure replacement, and highway interns presented their summer projects including traffic counts, paving inspections, and bridge-rating data work.

Charlie McKenzie of the highway department presented an INDOT coordination contract for a federally awarded project to replace the superstructure carrying Kenner Road over Boggo Creek; the contract establishes an 80% reimbursement for the engineering phase. The board approved the contract by voice vote.

McKenzie then introduced summer interns Jensen Long, Abby Schrock and Mary Baumgartner, who summarized field and office work: traffic counts using rubber tubes, paving and construction inspection, point pavement-markings inventory, adopt-a-road reconciliation, drainage-structure measurements and collecting historical bridge-rating data. One intern noted practical field methods: "If you've been driving around the county and seen a pair of rubber tubes out across the road, then that was probably us." Commissioners thanked the interns and praised the program.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source