Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Stormwater topic

No spam. Unsubscribe anytime.

Residents say repeated regrading left backyards flooded; developer and city point to drainage work

City of Clayton City Council · May 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Neighbors near Hunter's Path told council repeated grading has left yards flooded and raised foundation concerns; the developer and staff said planned grading, catch basins and a detention pond will move water into the storm system and inspections are planned by county and state agencies.

At the Hunter's Path public hearing, resident Shana Sanford described multiple grading attempts and persistent standing water in backyards, saying the yards have been "flooded the whole time" since initial grading. Sanford said a tile drain discovered earlier improved conditions temporarily but that heavy recent rains have left yards unusable and she asked for long‑term corrective solutions to protect foundations and yard usability.

Developer and city staff acknowledged the concerns and said they will investigate specific lots and work with Arbor Homes to determine whether current flooding stems from original grading or from subsequent work. Staff described the planned stormwater system: grading to move low spots into catch basins, pipes with orifices to control discharge rates and detention ponds that will reduce peak flow to downstream areas. Staff also said Miami County Soil and Water, the Ohio EPA and city engineering staff perform inspections during construction, and that the subdivision's HOA will assume maintenance of green spaces, ponds and stormwater features after build‑out.