Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Traffic Safety topic

No spam. Unsubscribe anytime.

Brightwaters approves $4,318.50 traffic study as village installs 25 mph limit

Brightwaters Village Board · March 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board agreed to pay GPI $4,318.50 for crash and collision analysis and traffic data collection for a North-side traffic and safety investigation; trustees said a 25 mph speed limit setup is being installed and the April study should recommend specific calming measures.

Trustees said the village is moving forward on traffic-calming measures in the north side of Brightwaters and approved a payment to an engineering firm for data collection.

A trustee reported the village is "in the middle of installing the 25 mile per hour speed limit setup in the village" and that a traffic study will be conducted at the end of April. The board then approved a motion to pay GPI $4,318.50 for crash and collision analysis and traffic collection related to that investigation.

During public comment residents raised multiple practical suggestions — larger pedestrian signage, raised crosswalks, pylons or planters to prevent parking in crosswalks, and, in the longer term, traffic circles — and urged the board to press for tangible recommendations rather than a perfunctory report. Board members said they paid for a $20,000 study and expect GPI to provide actionable measures when the study is completed.