Road report: cross‑pipe repairs, embankment work and Godfrey Road speed study results

Gilpin Township Board of Supervisors · May 20, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Road report detailed recent maintenance — cross‑pipe replacements and embankment work — and a speed study that logged 86 vehicles on Godfrey Road with a top recorded speed of 33 mph; none met the enforcement threshold.

Public works staff reported completed and ongoing road maintenance: cross‑pipe replacements on Brooklyn Gilpin Mine Road, shoulder and embankment work on Ray, pipe replacement on Wildlife‑Evergreen intersection, clearing downed trees, and manual patching and equipment maintenance. The presenter reviewed those operations and then summarized a speed study on Godfrey Road.

The speed study (May 12–19) recorded 86 vehicles with a top speed of 33 miles per hour; the presenter noted enforcement can only occur when drivers exceed the posted limit by 11 mph (i.e., 36 mph and above), so no vehicles met the enforcement threshold during the monitored period. The board accepted the road report by voice vote.