Teutopolis finalizes 2026 MFT road oiling list; engineer estimates $55,208 project cost
Summary
The Board reviewed the 2026 Motor Fuel Tax project map, finalized roads to be oiled this summer and heard Village Engineer Mitch Hardiek estimate the total project cost at approximately $55,208.
The Village of Teutopolis Board reviewed the 2026 Motor Fuel Tax (MFT) project map and calculations and finalized the list of roads scheduled for oiling during the Summer 2026 maintenance program. Village Engineer Mitch Hardiek estimated the total cost for the planned MFT work at approximately $55,208.
No separate vote or appropriation for the MFT program was recorded at the meeting; the Board accepted the engineer's recommendation and will proceed with planned maintenance under the MFT program and related budgeting procedures.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
