Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Hazard Mitigation topic

No spam. Unsubscribe anytime.

Town presents 20-item hazard mitigation plan with ferry resilience, groundwater and wildfire priorities

Shelter Island Town Board · April 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Shelter Island's working group proposed 20 mitigation initiatives including ferry operations resiliency, emergency drinking-water points, groundwater monitoring, stormwater improvements, and wildfire/shoreline stabilization; the plan will be submitted as a draft annex for county and FEMA review.

Emergency-management staff and the hazard-mitigation working group presented a draft list of 20 proposed initiatives intended to guide the town's priorities for the next five years. Key items include ferry-operations continuity and resiliency planning for all ferry terminals; EMS access improvements for low-elevation or hard-to-reach neighborhoods; stormwater and drainage upgrades; emergency drinking-water distribution points; groundwater-monitoring and management; and shoreline-stabilization and nourishment projects for Shell and Crescent beaches.

The town emphasized the plan is a planning-level document intended to improve eligibility for grant opportunities (FEMA and other sources) and will be refined with Tetra Tech and county/state reviewers before final adoption. "We've developed 20 proposed mitigation initiatives," said the emergency-management coordinator, noting the draft annex will be submitted to Tetra Tech and then undergo state and FEMA review.