Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Sipple Field Repairs topic

No spam. Unsubscribe anytime.

Commission recommends up to $13,000 for Sipple Field lighting repairs pending Village Board sign-off

Parks, Recreation and Tourism Commission · April 1, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Commission approved a motion to repair a woodpecker-damaged pole and replace lighting fixtures at Sipple Field, moving $13,000 from the general reserve fund; final approval will be considered by the Village Board on May 4.

Kent reported that a pole at Sipple Field appears damaged by a woodpecker and recommended repairs using a polywater underwood utility pole repair. The Commission approved a motion to repair the pole and to replace lighting fixtures as needed, with a budget not to exceed $13,000 to be moved from the general reserve fund.

The Commission’s motion requires final Village Board approval, which is scheduled for May 4. Members asked staff to confirm specific vendor quotes and timing before the Board meeting so work can proceed if the Village Board grants final authorization.