Summary

DPW Superintendent Robert Degrace reported seasonal blacktopping (including Tallman Street), sander readiness, scheduled concrete pours on Washington Street, and planned removal of Flanders Park docks; Tallman Street water and sewer mains and laterals have been replaced and lawns restored.

Department of Public Works Superintendent Robert Degrace reported completion of the season's blacktopping, including Bradley Hill and Tallman Street, and said the sander is ready for winter. Concrete is scheduled to be poured on Washington Street for recently replaced sidewalks, and the Flanders Park docks will be removed with Electric Department assistance by the end of the week. The board accepted the September 2024 DPW report (carried 5–0).

The minutes also record that Tallman Street's water and sewer mains and lateral lines were replaced, lawns were restored with topsoil and seed, and the road will be blacktopped before winter. The minutes do not include verbatim quotations from participants.