Sewer operator reports plant flowed 0.46 MGD and ran at 17% capacity in October
Summary
Sewer operator Josh Taylor told council the treatment plant averaged 0.46 million gallons per day in October and operated at roughly 17% capacity; he also reported pending injector pumps for lift-station generators and replacement diesel was added to three generators.
Get email alerts on the Wastewater topic
No spam. Unsubscribe anytime.
Josh Taylor, the city's sewer operator, briefed the council that the treatment plant operated at about 17 percent capacity during October with an average flow of 0.46 million gallons per day (MGD). He also updated council on Lift Stations 1, 2 and 4: injector pumps needed to repair the generators are awaiting manufacture and shipment, and the three generators had old diesel removed and fresh diesel added.
The council recorded the operational figures and the maintenance update but took no formal action on the report; the minutes do not indicate estimated repair timelines or costs for the injector pumps.