Sodus Point accepts water system study, plans SEQR and spring funding applications

Village of Sodus Point Village Board · December 19, 2024
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Trustees accepted the village's water system preliminary engineering report and directed staff to complete SEQR and pursue funding in spring; the village has requested outside help to support those next steps.

The Village of Sodus Point accepted the preliminary engineering report on its water system at the Dec. 19 meeting. Mayor McDowell said the board will complete the State Environmental Quality Review (SEQR) and begin applying for funding in the spring; the village has requested a proposal to assist with SEQR and grant-application tasks.

Trustees previously tabled parts of the preliminary engineering discussion pending a presentation from Barton & Loguidice, the engineering firm referenced in meeting minutes. No formal funding awards were made at the meeting; the board signaled intent to seek external grant and loan sources in 2025.