Trustees approve DPW diesel-line repair and building drainage work totaling $35,000

Village of Bronxville Board of Trustees · February 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board authorized $17,000 to repair a DPW diesel fuel line and approved two drainage-related repairs on a village building (about $18,000 and $17,400) funded from unassigned reserves.

Trustees approved a $17,000 capital expenditure to repair the DPW diesel fuel line, described as an environmental and wear-and-tear improvement. The chair and village administrator said the work will come from the unassigned fund balance and is intended to prevent fuel leaks and modernize infrastructure.

In two subsequent resolutions the board approved about $35,000 in total to address interior and exterior drain-pipe failures on a village building — $18,000 for east-side improvements and approximately $17,400 for the west side — including replacement of molding and new external copper downspouts. Trustees said the work is cost-effective compared with repairing interior brick-wall piping and moved both items to approval by vocal assent.