Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Renewable Energy topic

No spam. Unsubscribe anytime.

Evergy activation pending at police station; sewer-plant solar panels projecting $500–$1,000 monthly savings

Energy and Sustainability Task Force · June 10, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Task force notes Evergy has not yet activated police-station solar panels; panels at both sewer treatment plants are installed and are projected to save at least $500–$1,000 per month.

Members reported that Evergy has not yet switched on solar panels installed at the Warrensburg police station, delaying expected savings at that site. The minutes note that solar arrays are already installed at both sewer treatment plants.

The task force recorded a projected savings of "at least $500-$1,000/month" from the sewer-plant installations; no activation timetable for the police-station panels was recorded and no formal vote or financial commitment was taken during the meeting.