Plan cites FEMA panels and city stormwater rules, shows base flood elevations 14–16 ft

New Hampstead PUD plan document · January 22, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The plan references FEMA panels 13051C0104G and 13051C0108G (effective 8/16/2018) and lists Base Flood Elevations (BFE) of 14–16 ft. It states stormwater management will meet City of Savannah ordinance criteria and employ green infrastructure/low-impact development practices.

The New Hampstead plan cites FEMA panels 13051C0104G and 13051C0108G (effective Aug. 16, 2018) and lists Base Flood Elevations ranging from 14 to 16 feet in parts of the site. The document states multiple pond/lagoon features and a distributed stormwater approach across the master plan.

The plan explicitly requires the entire development to meet City of Savannah stormwater management criteria and promises use of green infrastructure and low-impact development practices "to the maximum extent practical" during creation of the stormwater management plan. The plan does not include supporting hydraulic analyses or storm-event modeling in the excerpt provided.