Study flags hydraulic constraints, ~21k GPD net change for 219 Littleton Road project
Summary
Staff reported hydraulic constraints including fire flow concerns in the draft water demand study for 219 Littleton Road and estimated a net change of about 21,000 gallons per day; MassDEP has approved septic plans for the antique building, which the applicant intends to retain as a residence.
Get email alerts on the Water Demand topic
No spam. Unsubscribe anytime.
Mark Warren reported to the commissioners that the draft water demand study for 219 Littleton Road identifies hydraulic constraints such as fire flow that need to be addressed.
Warren said the project shows a net change of about 21,000 gallons per day (21k GPD). Chair Hugh C. Maguire asked about the antique building at the front of the property; Assistant Town Manager Jeff Morrissette said the plan is to retain residency and that MassDEP has approved the septic plans. The commissioners agreed to review the study and discuss it at their next meeting.
The board did not take a vote on the study at this meeting; staff will return with further analysis and options to resolve the hydraulic constraints.