Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Capital Projects topic

No spam. Unsubscribe anytime.

Bonham staff lists unfunded equipment and infrastructure needs, from fire truck to WWTP design

Bonham City Council · August 5, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

City staff listed multiple unfunded needs including a fire truck, street sweeper, oil truck, WWTP design, water-line work on lake bridges and north fire station repairs; those items remain outside the FY2026–27 base budget and may require future funding or bonds.

Director Sarah Osburn reviewed a list of prior unfunded requisitions that remain outside the proposed FY2026–27 base budget. The list includes an oil truck, street sweeper, fire truck, north fire station repairs, a mini excavator, skid steer, water-line repairs on lake bridges, a mobile screw press and Wastewater Treatment Plant (WWTP) design, plus two full-time utilities positions and a part-time library position.