Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Historic Preservation topic

No spam. Unsubscribe anytime.

Trustees approve Burley Building second-story deck with engineering condition

Town of Rico Board of Trustees · May 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a nonconforming expansion and conditionally approved a building permit for the Burley Building second-story deck at 9 S Glasgow; the permit requires engineer documentation minimizing snow sluffing into the alley before issuance.

The Rico Board approved both a request to expand a nonconforming structure (the Burley Building second-story deck) and a related building permit for 9 S Glasgow on May 21. The Board of Adjustment approved the expansion 5-0 after applicant Erin Johnson's presentation and public comment from Larry Carver; the Trustees then approved the building permit on the condition that adequate engineer documentation be submitted to the Town Manager prior to issuance.

The permit motion specified that the engineer documentation must demonstrate measures that "minimize any sluffing of snow into the alley way" before the permit would be issued. The conditional approval was moved by Trustee Gerrish Willis and seconded by Mayor Patrick Fallon; the roll-call vote recorded approval by the trustees present.