Board vacates and re‑dedicates drainage easement at Shops at Greenfield

Kearney Board of Aldermen · April 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

To allow construction of a new commercial building at the Shops at Greenfield, the board approved ordinances vacating an existing drainage easement across Lot 4 and dedicating a replacement storm drainage easement, actions that were tied to prior site‑plan conditions.

The board approved two related ordinances to enable construction at the Shops at Greenfield. Community Development Director David Pavlich explained that a storm pipe runs through Lot 4 and must be relocated so a new commercial building can be built; the city therefore vacated a portion of the existing drainage easement and accepted a dedication of a replacement storm drainage easement across Lot 4.

Pavlich said the relocation and re‑dedication were conditions of the site's prior site‑plan approval and will be followed by a subsequent dedication of a new easement. The board read the vacation ordinance (Bill 15‑2025) and the dedication ordinance (Bill 16‑2025) by title and approved both on second reading with unanimous votes.

Staff told the board construction on the related building is expected to begin within the next couple of weeks. The actions resolve the storm‑water routing required by the approved site plan and allow the developer to proceed under the city's established conditions.