Summary

The Council on Aging reported that solar panels at the center are nearing completion and should be finished within a week; designers are revising roof-over-deck drawings to account for panel placement and engineers recommended consulting the building inspector before proceeding.

The Tisbury Council on Aging heard an update Feb. 19 from Director Catie Blake that the center's solar panel installation is nearing completion and is expected to finish within a week. Blake said excess energy from the system will feed back into the town grid and reduce the Center's electric bill.

Blake told members that the roof-over-deck project drawings are being revised after the designer observed the solar panel placement; engineers advised consulting the town building inspector before finalizing plans. The meeting notes also record that a person named Kirk plans to widen the driveway in spring, and members discussed coordinating exterior work to avoid conflicts with the solar installation.