Citizen Portal

Get email alerts on the Public Works topic

No spam. Unsubscribe anytime.

Village OKs up-to-$10,900 SCADA panel modifications for Well #7

Village Board of Trustees of Cherry Valley, Illinois · September 16, 2025

Summary

Trustees approved a change order with Metropolitan Pump Company for SCADA panel modifications and startup at Cherry Valley Well #7, not to exceed $10,900 from the Water fund. The vote was 6–0.

The board approved a change order with Metropolitan Pump Company of Romeoville, Ill., to perform SCADA panel modifications and be onsite for startup at Cherry Valley Well #7, with costs not to exceed $10,900 charged to line item 5400 (Water).

Trustee Mike Neville moved the approval and Trustee Nancy Belt seconded; a roll-call vote recorded six ayes. The minutes record the contractor, scope (SCADA panel modifications and startup), and the 'not to exceed' amount but do not list a schedule for the work.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source