Board directs staff to pursue ASR pilot injection permit for Montecito aquifer project

Montecito Water District Board of Directors · March 24, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a presentation on a proposed Aquifer Storage and Recovery (ASR) pilot, the Board directed staff to hire a consultant to prepare an ASR Pilot Injection Permit Application and return with next steps; no permit or construction authorization was granted.

Assistant GM/Engineering Manager Adam Kanold presented background on the proposed Montecito Aquifer Storage and Recovery (ASR) Project and described a pilot approach focused on testing injection feasibility and monitoring. Board discussion centered on permitting requirements and consultant scope.

The minutes record that the Board "directed staff to engage a qualified consultant to prepare the ASR Pilot Injection Permit Application and return to the Board for further action." That direction is not a permit approval or authorization to construct; it instructs staff to complete the regulatory application and bring a report back to the Board for a later decision. The record does not specify consultant names, permit timeline, injection volumes, or pilot locations.

Next steps: staff will solicit and retain a consultant to prepare the injection permit application. The Board expects a future agenda item with the consultant’s permit package and recommended next steps before any pilot injection work begins.