Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Lot Division topic

No spam. Unsubscribe anytime.

Board finds approval not required for lot division at 68687 Main Street to create duplex‑eligible parcel

Wareham Planning Board · August 11, 2026
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Engineers said dividing the 2.58‑acre MR‑30 parcel would create a vacant lot with 200 feet of frontage suitable for a duplex; the board found the A&R submission met criteria for an "approval not required" finding.

The Planning Board on Aug. 10 found an application for 68687 Main Street qualifies as an approval‑not‑required plan after the applicant's engineer said the proposed division created the required 200 feet of frontage in the MR‑30 district.

Bill Madden of GAF Engineering described the 2.58‑acre parcel and said the proposed vacant portion meets MR‑30 standards for frontage and area and shows required building setback lines. The board discussed some plan geometry questions but concluded the submission met A&R requirements and voted to record the finding. The board's action allows the applicant to proceed with the proposed lot configuration consistent with local permitting and zoning.