The Town of Dresden supervisor asked the Lake George Park Commission to consider financial support for a $36,000 comprehensive sewer study after describing aging infrastructure, capacity at about 94% of permit limits, and risks from pressurized outflows and flood‑borne debris.

The appointed supervisor of the Town of Dresden (referred to in the meeting as Paul) told the commission that aging sewer infrastructure in Hewlett’s Landing and parts of Gulis Landing needs a comprehensive engineering study to move beyond reactive maintenance and plan for long‑term capacity and environmental protection.

The supervisor described the district’s configuration and capacity challenges: roughly 150 homes in the town are on private septic systems (about 140 clustered in a three‑mile stretch), and roughly 100 homes are served by two separate sewer systems in Gulis Landing. He said the system is operating at about “94% of our speedies permit” during peak outflows and that pressurized outflows and log debris during storms present both known and unknown failure risks. “Without this study, we won't have the data that we need to ensure safe and reliable sewer,” he told commissioners.

The supervisor said the project team selected LaBella’s alternative 3 for a comprehensive study and cited an estimated study cost of $36,000 from a 2024 estimate. Commissioners asked for the study scope; the supervisor agreed to provide the specific scope and offered to return with more detail. Commissioners and staff discussed meeting with DEC and the consultant so the commission can decide whether and how to provide financial assistance at a future meeting.

Next steps: the supervisor asked for the commission to consider funding the study at a future meeting and to allow staff to coordinate a meeting with DEC and LaBella to clarify scope and collaboration before the commission makes a budget decision.