Citizen Portal

Get email alerts on the Construction topic

No spam. Unsubscribe anytime.

Board reviews guaranteed maximum prices for 2023 bond projects and discusses potential solar panel work

Lewisville Independent School District Board of Trustees · January 7, 2025

Summary

Lewisville ISD staff presented guaranteed maximum prices for Degan Elementary (FB13) and Lewisville Learning Center (FB20) under the 2023 Bond and raised potential solar panel projects; architect selections for second-sale projects were also listed.

District construction staff briefed the board on multiple 2023 Bond Program projects during the Jan. 7 work session. Executive Director of Facility Services Jason Hughes and Executive Director of Construction Randy Fite presented guaranteed maximum prices (GMPs) for the Degan Elementary School partial 20-year life-cycle maintenance and repair project (FB13) and an early package for the Lewisville Learning Center 20-year life-cycle maintenance and repair project (FB20). The minutes list the GMP items by project code but do not include GMP dollar figures.

Staff also discussed potential solar panel projects that could be included in the 2023 Bond scope, and the agenda noted upcoming 2023 Bond second-sale projects and architect selections. No final decisions or contract awards were recorded in the work-session minutes; those items are slated for follow-up with specific procurement details to be provided later.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source