Citizen Portal

Get email alerts on the Survey Parcels topic

No spam. Unsubscribe anytime.

Committee discusses combining parcels, surveying and access to potential site

Public Building Safety Committee · March 27, 2026

Summary

Members discussed combining three lots, ordering a survey (possibly of an 11-acre parcel to recover pins), and building a connector road to Meadow Road; survey results will determine precise buildable acreage.

Committee members discussed practical steps needed to make the candidate site buildable, including combining three parcels into one legal lot and commissioning a professional survey. The committee noted older pins may be lost and that, if necessary, surveying of the entire 11-acre parcel could be required to determine lot lines and to enable the creation of a connector road to Meadow Road.

Chair John Hayden asked whether an initial wetlands delineation would clarify potential usable acreage, and members agreed the delineation is an important early input before spending on full surveys or design. The committee noted that any need to mitigate wetlands on one lot could be addressed by creating wetlands on another lot as an offset.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source