Citizen Portal

Get email alerts on the Alcova Water Sewer Study topic

No spam. Unsubscribe anytime.

Staff: water-well sampling, bacteria testing planned for Alcova study

Park Board · August 14, 2026

Summary

Park staff told the board engineers completed most fieldwork for the Alcova water-sewer study; remaining tasks include targeted water-well sampling and tests for coliform, E. coli, nitrates and nitrites. Staff also reported outstanding lot permits.

Director Michael told trustees that engineers have finished field work for the Alcova water-sewer study except for water-well sampling and that staff recommended adding a baseline well at higher elevation to establish a reference for aquifer conditions.

"They're gonna be testing for coliform, E. Coli, bacteria, nitrates, nitrites," Michael said, noting the tests will provide a "full spectrum" water analysis. He said engineers are contacting cabin owners to collect samples next week. Michael also reported administrative follow-up: six signed lot permits remain missing and one lot fee is unpaid; staff are preparing letters to property owners.

The board discussed the timing and scope of sampling; Michael said a higher-elevation baseline well would help clarify whether septic systems are impacting the aquifer. Trustees did not set a public deadline for report release but asked staff to proceed with sampling and owner notification.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source