Citizen Portal

Council awards valve-replacement work to TLC, saving roughly $9,000 over alternate bid

Harmony City Council · February 11, 2026

Summary

Council accepted TLC's bid of $36,387.05 for valve replacements after comparing it to a roughly $40,000 bid from Olympic, noting sidewalk restoration will be required at the work site.

Public works staff presented two bids for valve replacement at the wastewater-treatment site and the council accepted the lower TLC bid.

The staff presenter (S2) said TLC bid $36,387.05 while a competing bid from Olympic was about $40,000, saving the city roughly $9,000 by selecting TLC. Councilmember (S4) moved to accept the TLC bid, a second was recorded and the motion carried. Staff noted the work will require some sidewalk restoration and the city will coordinate that restoration as part of the project.

The council approved the award at the recommended lower price and directed staff to coordinate excavation and restoration with the contractor and project schedule.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source