Citizen Portal

Get email alerts on the Drainage topic

No spam. Unsubscribe anytime.

Board approves $3,500 widening of E3 Basin control structure to improve outflow

River Ridge Community Development District · March 24, 2026

Summary

The River Ridge CDD approved MRI Construction Proposal #606 to widen the E3 Basin control structure weir to maximize community outflow; the board asked staff for before-and-after photos and asked about adding a manual gate.

The River Ridge Community Development District on March 24 approved MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure, a change intended to increase the flow capacity from the community. District Engineer Charlie Krebs described the current structure as "slightly shy of the maximum width," and the board approved the $3,500 proposal on a motion by Kurt Blumenthal and a second from Bob Schultz.

Board members discussed installing a manual open/close gate near the control structure; Charlie Krebs said he would inquire about the possibility and promised to provide before-and-after photographs and project specifications to the board. The board recorded the motion as passing "with all in favor."

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source