Get email alerts on the Environment topic
No spam. Unsubscribe anytime.
Todd County authorizes Barr Engineering groundwater review contract for $17,500
Summary
The board authorized the solid waste director to sign a $17,500 proposal from Barr Engineering to perform the annual groundwater quality data review required by Minnesota Pollution Control Agency permits (year corrected to 2026).
Get email alerts on the Environment topic
No spam. Unsubscribe anytime.
Todd County commissioners authorized the solid waste director April 21 to sign a professional-services proposal with Barr Engineering for $17,500 to perform the county’s annual groundwater quality data review required under Minnesota Pollution Control Agency permits.
Solid waste staff said the county has historically used Barr for the annual review and that the only correction needed in the drafted contract language was to change the year to 2026. "The options are to authorize the solid waste director to sign the proposal by Barr Engineering for $17,500," staff told the board. The board approved the authorization by voice vote after confirming the year correction would be made.
The contract authorization does not appropriate new funds; staff said the work is required by state law and is part of routine permit compliance. The director was authorized to sign the proposal and proceed with the work.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
