Citizen Portal

Get email alerts on the Regulatory Compliance topic

No spam. Unsubscribe anytime.

Staff: DNR does not require permits for tile-only recctor drain work; petition remains under review

Delaware County Drainage Board · August 12, 2026

Summary

Staff told the board that Indiana DNR does not require permits for tile-only drain reconstruction; the recctor drain petition remains on the table while staff confirm petition signatories and landowner support.

The board discussed a petition to reconstruct the recctor drain that traverses significant wetlands. County staff reported back that the Department of Natural Resources does not require permits for work that consists entirely of subsurface tile (no open ditch), though surveyor permit procedures apply to open drains. That clarification reduces some of the mitigation cost uncertainty for reconstruction.

Surveyor staff will follow up with petition signatories — including one potentially withdrawing (Mr. Cox) — before proceeding. Board members agreed to leave the petition on the table for another month to confirm the required landowner support percentage and any outstanding technical details.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source