Citizen Portal

Get email alerts on the Drainage topic

No spam. Unsubscribe anytime.

Board approves $3,500 to widen E3 Basin control structure to improve drainage

River Ridge Community Development District Board of Supervisors · March 24, 2026

Summary

The River Ridge board approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control structure to its maximum width to improve community drainage; staff will provide before-and-after photos and investigate a manual gate option.

The board approved MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure for $3,500. Mrs. Adams presented the proposal and Charlie Krebs explained the work will use a concrete saw to increase the weir width to the maximum allowable dimension to improve outflow to the Florida Power & Light easement. The motion by Kurt Blumenthal, seconded by Bob Schultz, passed "with all in favor."

Krebs said the current control structure is slightly shy of maximum width and that the change intends to get the most water out of the community; the board discussed whether a manual open/close gate could be installed near the control structure. Krebs will provide before‑and‑after photographs and project specifications to the board and will inquire about installing a manual gate.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source