Get email alerts on the Stormwater Infrastructure topic
No spam. Unsubscribe anytime.
Board authorizes $3,500 widening of E3 Basin control structure to increase outflow
Summary
The board approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control structure's weir to the maximum width to improve outflow toward the FPL easement; Krebs will provide before‑and‑after photos and explore a manual gate.
Get email alerts on the Stormwater Infrastructure topic
No spam. Unsubscribe anytime.
The board approved MRI Construction Proposal #606 to widen the E3 Basin control structure weir to the maximum allowed width to increase outflow to the Florida Power & Light easement. Mrs. Adams presented the proposal and District Engineer Charlie Krebs explained MRI would use a concrete saw to widen the weir; on a motion by Supervisor Kurt Blumenthal, seconded by Supervisor Bob Schultz, the proposal was approved for $3,500.
Krebs said he will provide before‑and‑after photographs and send project details and specifications to the board, and will inquire about installing a manual open/close gate near the control structure to allow greater operational control of outflow.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
