Get email alerts on the Infrastructure And Parcels topic
No spam. Unsubscribe anytime.
Silver Subdivision: lot sizes, access and sidewalk requirements outlined
Summary
The Silver Subdivision final plat creates four parcels (site 0 Williams Street) with parcel widths of 22–33 feet and areas of 2,598–3,739 sq ft; only three parcels may contain dwellings and the fourth will provide shared rear access and parking; sidewalks and ESA requirements were recorded.
Get email alerts on the Infrastructure And Parcels topic
No spam. Unsubscribe anytime.
MPC staff's findings on the Silver Subdivision describe parcel dimensions and access arrangements for the 0.26-acre site at 0 Williams Street. The proposed subdivision will create four parcels: widths range from 22 to 33 feet and areas from 2,598 to 3,739 square feet. Only three of the parcels are permitted to contain dwellings; the fourth (Lot 67-A) is designated as a no-dwelling lot for shared access and rear-entry parking.
The memorandum requires that sidewalks be installed on all lots adjoining Williams Street and that building permit applicants for the residential lots install those sidewalks prior to issuance of a Certificate of Occupancy in accordance with City of Savannah Subdivision Regulations. An Environmental Site Assessment has been submitted to the City Engineer and will be part of the permitting record. Water and sewer service will be provided by the City of Savannah and the site is within 500 feet of a Chatham Area Transit bus line on Victory Drive.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
