Citizen Portal

Get email alerts on the Water Management topic

No spam. Unsubscribe anytime.

River Ridge approves $7,026 repair for lake aeration equipment

River Ridge Community Development District · April 28, 2026

Summary

The board approved a one-time work order with Premier Lakes, authorizing $7,026 to repair nano bubble aeration equipment on three lakes after staff presented alternatives to a $25,000 manufacturer replacement.

Bill Kurth of Premier Lakes told the board that "the lakes and the dry retention areas (DRAs) are in good condition," while also reporting issues with the nano bubbler systems on Lakes H1-A, H1-B and E7-A. Member Terry Mountford raised concerns about invasive vegetation at Lakes 9, E3-C and Conservation B-2191 and requested inspection and treatment.

Kurth said the manufacturer Mollier proposed a $25,000 replacement for the nano bubblers. As a lower-cost alternative, Premier presented a one-time work order to replace nonstandard 8-horsepower pumps, aeration compressors and check valves to return systems to operation and then evaluate for further repairs. On motion by Kurt Blumenthal and seconded by Robert Twombly, the Board approved the Premier Lakes One-Time Work Order Agreement, as amended, in the amount of $7,026 to repair the nano bubble machines on the three lakes.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source