Citizen Portal

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Township OKs temporary Farmbrook Lane closure for sewer work tied to Pump Station #2 decommissioning

Manchester Township Board of Supervisors · November 12, 2024

Summary

Board authorized closing Farmbrook Lane from Susquehanna Trail to Farmtrail Road during work hours for the sewer-line installation related to decommissioning Pump Station #2 (vote 4‑0).

The board authorized a temporary closure of Farmbrook Lane, between Susquehanna Trail and Farmtrail Road, during work hours to allow sewer-line installation connected to the decommissioning of Pump Station #2. Supervisor McCune moved for the authorization and Supervisor Long seconded; the motion passed unanimously.

The closure authorization is limited to the duration of the sewer installation work and applies to work‑hour restrictions; the meeting minutes did not specify start and end dates for the closure, only that the action was authorized for the duration of the sewer work.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source