Citizen Portal

New Salem Engineer: ADA Ramp Permit Sent to PennDOT, 2025 Road Bids to Post Next Week

New Salem Borough Council · June 3, 2025

Summary

Engineer David Lipinski told council that additional ADA ramp information was forwarded to PennDOT to close the permit, and that 2025 road‑work bid specifications will be posted on PennBID next week with bids expected for action at the July 1 meeting; he also flagged a potential sinkhole on Sherwood Drive.

At the June 3 council meeting, borough engineer David Lipinski reported that the additional documentation for ADA ramps has been forwarded to PennDOT to close out the associated permit. Lipinski said the borough's 2025 road‑work bid specifications will be posted on PennBID next week and that bids will be available for council action at the July 1 meeting.

Lipinski also noted he inspected a potential roadway sink issue on Sherwood Drive and said further checks are required. The council did not take immediate action on the Sherwood Drive concern but has scheduled the road‑work procurement timeline to proceed with advertising and bid collection ahead of the July meeting.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source