Board approves temporary construction easement for 17th Street bridge replacement
Summary
Supervisors approved a temporary construction easement from the John and Donna Heckman Trust to allow contractor staging and work on the 17th Street bridge replacement; the trust had signed and notarized the document before the meeting.
County staff presented a temporary construction easement from the John and Donna Heckman Trust to support staging and contractor access for the 17th Street bridge replacement project and told supervisors the trust had “already signed it and had it notarized.” A supervisor moved to approve the easement, a second was recorded and the board voted in favor.
The chair and board thanked local landowners for cooperating with the project and noted that using nearby property for staging helps keep projects on time and reduce costs. Staff said they would forward the signed document for the board chair’s signature and process the easement with county records.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

