Get email alerts on the Roads topic
No spam. Unsubscribe anytime.
Commissioners press for tighter oversight on P Road project and schedule culvert replacements
Summary
Smith County commissioners asked road supervisors for stricter mile-by-mile sign-offs after surprises on the P Road resurfacing project and approved multiple culvert (tube) replacements planned for 2025.
Get email alerts on the Roads topic
No spam. Unsubscribe anytime.
Smith County commissioners on April 7 pressed the road department for clearer oversight of ongoing road projects after Chair Jim Gwennap said crews encountered unexpected changes in the P Road resurfacing work.
Gwennap told Road Supervisor Mitch Fritz and Assistant Road Supervisor Travis Story he was concerned “there were a lot of surprises on the P Road project,” including variations in how much asphalt was mixed with rock and what material was removed from ditches. Story proposed a process under which commissioners would sign off on each mile before crews apply rock to reduce miscommunication. Commissioners asked for the spreadsheet Story provided to be implemented departmentwide to help track work.
Commissioner Kurt Ifland and Story also discussed specific culvert replacements. Ifland asked about tubes on R Road and 140 Road; Story said those are planned for replacement this year. Fritz reported that the tube on 165 Road between V Road and W Road will need replacement after his inspection, and Story agreed to have staff evaluate a potential installation on 230 Road.
The board also confirmed operational details for compaction: Fritz said crews will water rock while laying it to improve compaction and driveway entrances will be repaired as part of the paving work. The commissioners instructed Story to post signs warning local traffic about increased truck movements on haul routes.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
