River Ridge reviewed a revised Long Range Plan that includes a near-complete $291,500 backup irrigation well and multi-year gatehouse and monument replacement estimates; staff said CIP changes could necessitate an approximately $2.5 million loan.
Get email alerts on the Gatehouse Renovation topic
No spam. Unsubscribe anytime.
Eric Long reviewed the Long Range Plan and reported the Traffic Calming Project (radar sign and camera) was completed at a cost of $26,739. He said the backup irrigation well project is near completion; the additional well cost is $291,500, and Long expects the pump to be installed and operational within weeks. He said they will conduct water-quality testing on both wells and that the new well is expected to serve as the primary well because the existing well has a kink in the casing.
Long also discussed monument and gatehouse replacement costs: an estimate of probable cost to replace the four monuments remains $250,000, and gatehouse renovation estimates are $615,775 for FY2026 and $407,240 for FY2027. Mr. Long said the overall change in the capital improvement plan will necessitate a loan of approximately $2.5 million; staff will coordinate permitting with the Village of Estero and SFWMD as projects proceed.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.