Village wastewater staff reported a sludge drain problem May 8–9 caused by a pump malfunction that nearly led to an overflow; servicing also revealed a failed generator circuit board quoted at $3,655.87. A meeting with NYS DEC on sewer upgrades was scheduled for May 20, 2026.

Village wastewater operators told trustees that a malfunctioning pump nearly caused a sludge tank overflow early in May and that generator repairs are needed after servicing.

Fred DiRisio reported that on May 8 and 9 a drain at the sludge tank had collected sludge and nearly overflowed following a pump failure. DiRisio said the issue was addressed but flagged as a serious maintenance incident. He also reported that during routine servicing at the plant a generator circuit board was found to be "shot" and quoted a replacement cost of $3,655.87; the board later authorized Penn Power to make the repair.

DiRisio added that a vault has been installed for the Brutus Road tank but that related EFI buildings may be delayed until September or October. He said he was scheduled to meet with the New York State Department of Environmental Conservation on May 20 to discuss sewer upgrades and new parameters.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source