Get email alerts on the Stormwater Management topic
No spam. Unsubscribe anytime.
Board approves $3,500 to widen E3 basin control structure to improve outflow
Summary
The Board approved MRI Construction Proposal #606 to widen the E3 Basin control structure weir to the maximum width for $3,500; the engineer will provide before/after photos and consider a manual gate.
Get email alerts on the Stormwater Management topic
No spam. Unsubscribe anytime.
Mrs. Cleo Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Charlie Krebs explained the current control structure is slightly less than the maximum allowable width and proposed using a concrete saw to widen the weir to maximize outflow. On a motion by Supervisor Kurt Blumenthal, seconded by Supervisor Bob Schultz, the Board approved the proposal in the amount of $3,500.
Mr. Krebs said he will provide before-and-after photographs of the control-structure widening, send the project details and specifications to the Board, and inquire about installing a manual open/close gate near the structure to allow additional control if needed.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
